2024 Ash Street Utility & Street Improvements
Sector: Water Supply and Storage • Location: Spooner, Wisconsin, United States of America
Source: Dodge USA
1 LS Mobilization and Traffic Control 1,200 LF Remove Existing Storm Sewer and Structures 11,000 SY Remove Asphalt, Curb, and Sidewalks 12 Each Clearing and Grubbing Trees 4,500 CY Common Excavation 4,700 Ton Crushed Aggregate Base Course 2,000 Ton Asphalt Pavement 4,100 LF Concrete Curb and Gutter 12,000 SF 4- and 6-inch Concrete Sidewalk, Steps or Driveway 5,000 SY Turf Establishment 60 LF 42 in
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Spooner, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Ash Street Utility & Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1 LS Mobilization and Traffic Control 1,200 LF Remove Existing Storm Sewer and Structures 11,000 SY Remove Asphalt, Curb, and Sidewalks 12 Each Clearing and Grubbing Trees 4,500 CY Common Excavation 4,700 Ton Crushed Aggregate Base Course 2,000 Ton Asphalt Pavement 4,100 LF Concrete Curb and Gutter 12,000 SF 4- and 6-inch Concrete Sidewalk, Steps or Driveway 5,000 SY Turf Establishment 60 LF 42 inch RCP Storm Sewer 500 LF 30- and 36-inch HDPE Storm Sewer 750 LF 18- and 24-inch HDPE Storm Sewe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Spooner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
