logo
ProjectClosed

2024 Asphalt Improvements

Closed · Alberta · Last reported May 2024

Source: Dodge USA

Location 1: 5th Avenue from CP rail tracks (13th Street) to 17th Street - Supply all traffic control. Paved road width = 40ft Mill existing asphalt surface or removal approximately 36,800ft2 Mill tie-in Supply and install 2 storm manhole risers, 2 sewer manhole risers, 6 catch basin risers, and adjust 1 water main valve (as required). Supply, place and compact 50mm Type 3 asphalt overlay approxima

Status
Closed
Sector
Rail, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
Location
Fort Macleod, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Asphalt Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Asphalt Improvements” is an infrastructure initiative in the Rail sector, located in Fort Macleod, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Location 1: 5th Avenue from CP rail tracks (13th Street) to 17th Street - Supply all traffic control. Paved road width = 40ft Mill existing asphalt surface or removal approximately 36,800ft2 Mill tie-in Supply and install 2 storm manhole risers, 2 sewer manhole risers, 6 catch basin risers, and adjust 1 water main valve (as required). Supply, place and compact 50mm Type 3 asphalt overlay approximately 36,800ft2. Location 2: 5th Avenue from 20th Street to 23rd Street (Chief Red Crow Blvd) - Su...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Fort Macleod

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Rail, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-07-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project