2024 Big Sandy CDBG Water Meter Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project consists of: 1. The replacement of approximately 586 existing water meters with new AMR meters. 2. The replacement of approximately 4 existing 1 water meters with new AMR meters. 3. The replacement of approximately 2 existing 1-1/2 water meters with new AMR meters. 4. The replacement of approximately 2 existing 2 water meters with new AMR meters. 5. Replace approximately 400 meter box
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Big Sandy, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 Big Sandy CDBG Water Meter Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results, construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of: 1. The replacement of approximately 586 existing water meters with new AMR meters. 2. The replacement of approximately 4 existing 1 water meters with new AMR meters. 3. The replacement of approximately 2 existing 1-1/2 water meters with new AMR meters. 4. The replacement of approximately 2 existing 2 water meters with new AMR meters. 5. Replace approximately 400 meter boxes. 6. Adjust/Level approximately 50 meter boxes. 7. Install approximately 7,500 LF of PEXa servi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Big Sandy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
