2024 Big Sioux Levee Repair Project
One of 10,000+ projects Taiyo tracks in South Dakota.
Source: Dodge USA
40 working days for base bid. 50 working days for Alternate A. The 2024 Big Sioux Levee Repair Project will consist of the repair of two areas along the Big Sioux River Levee at the Dakota Dunes, including the use of 20,000 tons of rock material, 40,000 cubic yards of dirt excavation/hauling, and various slope stability items.
- Status
- Closed
- Sector
- Government, Manufacturing (Industrial), Commercial
- Location
- Dakota Dunes, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Big Sioux Levee Repair Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 40 working days for base bid. 50 working days for Alternate A. The 2024 Big Sioux Levee Repair Project will consist of the repair of two areas along the Big Sioux River Levee at the Dakota Dunes, including the use of 20,000 tons of rock material, 40,000 cubic yards of dirt excavation/hauling, and various slope stability items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Dakota Dunes |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details