logo
ProjectClosed

2024 Bituminous Resurfacing

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project is to resurface approximately 2.2 miles of Class "C" Streets located at various locations in the City of Detroit. The work consists of milling approximately 38,660 square yards of Cold Milling HMA Surface and resurfacing with two courses of bituminous mixture (approximately 4,253 tons of 2" thick 4EML HMA and approximately 3,209 tons of 1 " thick 5EML HMA); removing and installing appr

Status
Closed
Sector
Car parking, Road, Cement, Automotive, Government, Commercial, Manufacturing (Industrial)
Location
Detroit, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Bituminous Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Bituminous Resurfacing” is an infrastructure initiative in the Car parking sector, located in Detroit, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is to resurface approximately 2.2 miles of Class "C" Streets located at various locations in the City of Detroit. The work consists of milling approximately 38,660 square yards of Cold Milling HMA Surface and resurfacing with two courses of bituminous mixture (approximately 4,253 tons of 2" thick 4EML HMA and approximately 3,209 tons of 1 " thick 5EML HMA); removing and installing approximately 59,000 square feet of concrete 4-inch and/or 6-inch sidewalk with and without tree root...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Detroit

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Road, Cement, Automotive, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project