2024 Brudenell Left Turn Lane Route 4
Sector: Cement • Location: Charlottetown, Prince Edward Island, Canada
Source: Dodge USA
The work includes: Cold planing asphalt(50mm, and full depth in areas of widening), earth excavation, placing select borrow, placing class A granular, placing concrete curb, placing asphalt base A (60mm), placing asphalt levelling A (60mm), placing asphalt seal B (50mm), landscaping and all other work necessary to complete the project.
- Status
- Prospective
- Sector
- Cement, Road, Commercial, Manufacturing (Industrial)
- Location
- Charlottetown, Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Brudenell Left Turn Lane Route 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes: Cold planing asphalt(50mm, and full depth in areas of widening), earth excavation, placing select borrow, placing class A granular, placing concrete curb, placing asphalt base A (60mm), placing asphalt levelling A (60mm), placing asphalt seal B (50mm), landscaping and all other work necessary to complete the project. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
City | Charlottetown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
