2024 Campbell Street Culvert Replacement
Bid results · Georgia · Last reported Oct 2024
Source: Dodge USA
The work includes removing existing cross drain culvert, pipe and headwalls and replacing with a 9 x4 box culvert with headwalls. The work will also include removing existing driveway pipes with associated headwalls and replace with piping of the existing ditch along the south side of Campbell Street from the existing creek to Martin Luther King, Jr. Drive.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
- Location
- Thomasville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Campbell Street Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes removing existing cross drain culvert, pipe and headwalls and replacing with a 9 x4 box culvert with headwalls. The work will also include removing existing driveway pipes with associated headwalls and replace with piping of the existing ditch along the south side of Campbell Street from the existing creek to Martin Luther King, Jr. Drive. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Thomasville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
