2024 Cannon River View Trail
Sector: Cement • Location: Faribault, Minnesota, United States of America
Source: Dodge USA
The work includes approximate quantities of major items as follows: Clearing & Grubbing - 0.5 AC Common Excavation - 630 CY Aggregate Base Class 5 - 925 CY Bituminous Mixture - 1,186 TN 6 Concrete Walk - 80 SF Silt Fence - 800 LF Seeding - 1.10 AC
- Status
- Prospective
- Sector
- Cement, Car parking, Mass Transit, Consumer Products, Automotive, Rail, Government, Commercial
- Location
- Faribault, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Cannon River View Trail
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes approximate quantities of major items as follows: Clearing & Grubbing - 0.5 AC Common Excavation - 630 CY Aggregate Base Class 5 - 925 CY Bituminous Mixture - 1,186 TN 6 Concrete Walk - 80 SF Silt Fence - 800 LF Seeding - 1.10 AC |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Faribault |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Mass Transit, Consumer Products, Automotive, Rail, Government, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
