2024 Capital Road Improvement - Phase 2
Sector: Cement • Location: Colts Neck, New Jersey, United States of America
Source: Dodge USA
The scope of Work contemplated for the above named Project includes improvements to portions of several roadways in Colts Neck Township to include milling; concrete vertical curb; storm drainage improvements; driveway reconstruction; installation of HMA base course and surface course; SESC; roadway striping; and yard restoration as well as all other Work of any type or description necessary for co
- Status
- Closed
- Sector
- Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Colts Neck, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Capital Road Improvement - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of Work contemplated for the above named Project includes improvements to portions of several roadways in Colts Neck Township to include milling; concrete vertical curb; storm drainage improvements; driveway reconstruction; installation of HMA base course and surface course; SESC; roadway striping; and yard restoration as well as all other Work of any type or description necessary for completion of the Project, whether or not specifically described in these Contract Documents. All W... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Colts Neck |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
