logo
ProjectClosed

2024 Capital Works

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Replace existing 150 mm force main from the Downtown sewage lift station. Remove and Replace 3 sanitary sewer manholes. CIPP lining of 200 mm VCT sanitary sewer and 250 mm VCT sanitary sewer. Remove and Replace existing 200mm gravity sanitary sewer pipeline.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Vegreville, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Capital Works

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Capital Works” is an infrastructure initiative in the Water Supply and Storage sector, located in Vegreville, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace existing 150 mm force main from the Downtown sewage lift station. Remove and Replace 3 sanitary sewer manholes. CIPP lining of 200 mm VCT sanitary sewer and 250 mm VCT sanitary sewer. Remove and Replace existing 200mm gravity sanitary sewer pipeline.

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Vegreville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project