2024 Central Station Paving
Sector: Car parking • Location: Kalamazoo, Michigan, United States of America
Source: Dodge USA
Removal and replacement of pavement located at 215 E Stockbridge Ave. Kalamazoo, MI 49001. Work included consists of (but may not be limited to) painting parking lot (per sketches attached to bid document), the removal and restoration of sod based shoulders around perimeter of pavement, the removal and replacement of gate and bollards (closest to Stockbridge Ave) associated with the area. Any addi
- Status
- Closed
- Sector
- Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Kalamazoo, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Central Station Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal and replacement of pavement located at 215 E Stockbridge Ave. Kalamazoo, MI 49001. Work included consists of (but may not be limited to) painting parking lot (per sketches attached to bid document), the removal and restoration of sod based shoulders around perimeter of pavement, the removal and replacement of gate and bollards (closest to Stockbridge Ave) associated with the area. Any additional pricing for incidental work shall be approved by a city engineer and charged to EXCAVATION... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Kalamazoo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
