logo
ProjectClosed

2024 Chagrin River Access

Closed · Ohio · Last reported Mar 2024

Source: Dodge USA

Area of dredging is within the following limits: A. Approximately 6 600 lineal feet of the Chagrin River from the rivers mouth at Lake Erie to 1/4 mile past the Lakeshore Blvd Bridge. B. Approximately 3100 lineal feet in the East Channel and C. Approximately 3200 lineal feet in the West Channel.

Status
Closed
Sector
Bridge, Government, Commercial, Manufacturing (Industrial)
Location
Eastlake, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Chagrin River Access

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Chagrin River Access” is an infrastructure initiative in the Bridge sector, located in Eastlake, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Area of dredging is within the following limits: A. Approximately 6 600 lineal feet of the Chagrin River from the rivers mouth at Lake Erie to 1/4 mile past the Lakeshore Blvd Bridge. B. Approximately 3100 lineal feet in the East Channel and C. Approximately 3200 lineal feet in the West Channel.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Eastlake

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project