2024 CIPP Small and Medium Diameter Pkg 1
Sector: Water Supply and Storage • Location: Fort Wayne, Indiana, United States of America
Source: Dodge
This project is the CIPP lining of approximately 67,000 linear feet of small and medium diameter (8" to 36") sewers throughout the City. These pipes have been selected to be lined because of evidence of deterioration, high risk, and high cost of replacement.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Consumer Products, Hospital, Hotel, Commercial, Waste Processing and Treatment
- Location
- Fort Wayne, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 CIPP Small and Medium Diameter Pkg 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the CIPP lining of approximately 67,000 linear feet of small and medium diameter (8" to 36") sewers throughout the City. These pipes have been selected to be lined because of evidence of deterioration, high risk, and high cost of replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Fort Wayne |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Consumer Products, Hospital, Hotel, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
