2024 City of Redwood Curb Ramp
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Install curb ramp and curb return improvements with associated roadway regrading and misc improvement as needed such as installation of curb, sidewalk, curb ramps, demolition of existing improvements, and conform paving; drainage improvements; signing, striping, and installation of bollards; and adjusting surface facility covers at various locations and intersections throughout the City. Work shal
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Rail, Waste Processing and Treatment, Commercial, Mass Transit, Car parking, Automotive
- Location
- Redwood City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 City of Redwood Curb Ramp
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install curb ramp and curb return improvements with associated roadway regrading and misc improvement as needed such as installation of curb, sidewalk, curb ramps, demolition of existing improvements, and conform paving; drainage improvements; signing, striping, and installation of bollards; and adjusting surface facility covers at various locations and intersections throughout the City. Work shall be completed within 120 Calendar Days from the date when Contract Time commences to run. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Redwood City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Rail, Waste Processing and Treatment, Commercial, Mass Transit, Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
