2024 Clarendon Hills Road Program
Sector: Road • Location: Clarendon Hills, Illinois, United States of America
Source: Dodge USA
The proposed work is officially known asthe 2024 ROAD PROGRAM and furtherdescribed as a resurfacing project. Thework to be performed consists of PCCSidewalk, Curb and Gutter, DrivewayRemoval and Replacement, HMA SurfaceRemoval, HMA Binder Course, HMASurface Course, Structure Adjustmentand Reconstruction, ParkwayRestoration, and all incidental andcollateral work necessary to complete theimprovement
- Status
- Closed
- Sector
- Road, Government, Commercial, Power Generation (CCGT)
- Location
- Clarendon Hills, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Clarendon Hills Road Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work is officially known asthe 2024 ROAD PROGRAM and furtherdescribed as a resurfacing project. Thework to be performed consists of PCCSidewalk, Curb and Gutter, DrivewayRemoval and Replacement, HMA SurfaceRemoval, HMA Binder Course, HMASurface Course, Structure Adjustmentand Reconstruction, ParkwayRestoration, and all incidental andcollateral work necessary to complete theimprovement as shown and described inthe contract. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Clarendon Hills |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
