logo

2024 Columbia Ave Infrastructure Improvements

Sector: Water Supply and Storage • Location: Battle Creek, Michigan, United States of America

Source: Dodge USA

Project
Bid Results

The City of Battle Creek will accept sealed bids for the 2024 Columbia Ave Infrastructure Project. This project consists of, but is not limited to, replacing 6 watermain on Foster Dr. between Columbia and Surby Ave with 8 watermain and replacing 8 watermain on Lakeview Ave from Foster Dr to Lavista Blvd with 8 watermain. Stormwater improvements will also be made arond the identified sections in th

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Battle Creek, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Columbia Ave Infrastructure Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Columbia Ave Infrastructure Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Battle Creek, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Battle Creek will accept sealed bids for the 2024 Columbia Ave Infrastructure Project. This project consists of, but is not limited to, replacing 6 watermain on Foster Dr. between Columbia and Surby Ave with 8 watermain and replacing 8 watermain on Lakeview Ave from Foster Dr to Lavista Blvd with 8 watermain. Stormwater improvements will also be made arond the identified sections in the plans in an effort to eliminate direct outfall to untreated stormwater into Goguac Lake.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Battle Creek

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project