2024 Columbia Ave Infrastructure Improvements
Sector: Water Supply and Storage • Location: Battle Creek, Michigan, United States of America
Source: Dodge USA
The City of Battle Creek will accept sealed bids for the 2024 Columbia Ave Infrastructure Project. This project consists of, but is not limited to, replacing 6 watermain on Foster Dr. between Columbia and Surby Ave with 8 watermain and replacing 8 watermain on Lakeview Ave from Foster Dr to Lavista Blvd with 8 watermain. Stormwater improvements will also be made arond the identified sections in th
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Battle Creek, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Columbia Ave Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Battle Creek will accept sealed bids for the 2024 Columbia Ave Infrastructure Project. This project consists of, but is not limited to, replacing 6 watermain on Foster Dr. between Columbia and Surby Ave with 8 watermain and replacing 8 watermain on Lakeview Ave from Foster Dr to Lavista Blvd with 8 watermain. Stormwater improvements will also be made arond the identified sections in the plans in an effort to eliminate direct outfall to untreated stormwater into Goguac Lake. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Battle Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
