logo

2024 Community Center Front Entry Ramp & Dock Replacement

Sector: Rail • Location: Atkinson, New Hampshire, United States of America

Source: Dodge USA

Project
Bidding

for Front Entry Ramp and Dock Community Center-- To replace a 5 -6 x 40 front entry ramp and replace a 4 x 80 dock/deck located along the pond at the rear of the Atkinson Community Center. The Atkinson Community Center is located at 4 Main Street, Atkinson, NH 03811 SCOPE OF WORK: Front Entry Ramp - 5 - 6 x 40 - 0 Remove existing structure Reconstruct with P.T. 2 x 8 joists 12 O.C Decking: 5/4 x 6

Status
Prospective
Sector
Rail, Government, Manufacturing (Industrial), Road, Commercial
Location
Atkinson, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Community Center Front Entry Ramp & Dock Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Community Center Front Entry Ramp & Dock Replacement” is an infrastructure initiative in the Rail sector, located in Atkinson, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

for Front Entry Ramp and Dock Community Center-- To replace a 5 -6 x 40 front entry ramp and replace a 4 x 80 dock/deck located along the pond at the rear of the Atkinson Community Center. The Atkinson Community Center is located at 4 Main Street, Atkinson, NH 03811 SCOPE OF WORK: Front Entry Ramp - 5 - 6 x 40 - 0 Remove existing structure Reconstruct with P.T. 2 x 8 joists 12 O.C Decking: 5/4 x 6 fiberon symmetry Railing: Install upper and lower ADA compliant. Exterior handrails on both side...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Atkinson

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Rail, Government, Manufacturing (Industrial), Road, Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project