2024 Concourse G Apron & Taxiway B Pavement Reconstruction
Sector: Water Supply and Storage • Location: Saint Paul, Minnesota, United States of America
Source: Dodge USA
This project provides for the full reconstruction of a portion of the G Concourse Apron between aircraft Gates G6 and G8 (a concrete apron pavement segment approximately 500 feet in length by 250 feet in width) and a portion of Taxiway B abeam Gates G6 and G8 (a concrete taxiway pavement segment approximately 350 feet in length by 250 feet in width). The project includes construction of concrete p
- Status
- Closed
- Sector
- Water Supply and Storage, Aerospace & Defense, Cement, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Concourse G Apron & Taxiway B Pavement Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project provides for the full reconstruction of a portion of the G Concourse Apron between aircraft Gates G6 and G8 (a concrete apron pavement segment approximately 500 feet in length by 250 feet in width) and a portion of Taxiway B abeam Gates G6 and G8 (a concrete taxiway pavement segment approximately 350 feet in length by 250 feet in width). The project includes construction of concrete pavements; taxiway centerline lighting; apron lighting; aircraft hydrant fueling system; storm sew... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Aerospace & Defense, Cement, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
