2024 Concrete Sidewalk Replacement Program IQC
Closed · Minnesota · Last reported Mar 2024
Source: Dodge USA
The work performed under this Contract includes the furnishing of all labor, equipment, tools, and materials necessary to install monolithic concrete sidewalk, ADA compliant pedestrian ramps, curb & gutter, driveway aprons, and concrete alley pavement. In general, the work to be performed for the 2024 construction season is located in the highlighted areas shown on the attached maps (see Attachmen
- Status
- Closed
- Sector
- Cement, Road, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Concrete Sidewalk Replacement Program IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work performed under this Contract includes the furnishing of all labor, equipment, tools, and materials necessary to install monolithic concrete sidewalk, ADA compliant pedestrian ramps, curb & gutter, driveway aprons, and concrete alley pavement. In general, the work to be performed for the 2024 construction season is located in the highlighted areas shown on the attached maps (see Attachment A). However, the Contractor shall expect that a significant amount of additional work outside o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
