logo
ProjectClosed

2024 Curb & Gutter with Utilities

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

2024 Curb & Gutter with Utilities South This project consists of reconstructing 5 blocks of existing streets on 14th Street S, Barlow Street, and 21st Street S, including sanitary and storm sewer replacements. Items to bid include approximately 700 lineal feet of sanitary sewer main, 3 sewer manholes complete, 1 storm sewer manhole complete, 2,900 lineal feet of curb and gutter, 11,700 square feet

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Power Generation (CCGT)
Location
La Crosse, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Curb & Gutter with Utilities

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Curb & Gutter with Utilities” is an infrastructure initiative in the Commercial sector, located in La Crosse, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2024 Curb & Gutter with Utilities South This project consists of reconstructing 5 blocks of existing streets on 14th Street S, Barlow Street, and 21st Street S, including sanitary and storm sewer replacements. Items to bid include approximately 700 lineal feet of sanitary sewer main, 3 sewer manholes complete, 1 storm sewer manhole complete, 2,900 lineal feet of curb and gutter, 11,700 square feet of concrete flatwork.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

La Crosse

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Government, Power Generation (CCGT)

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project