2024 Curb Repair Program
One of 10,000+ projects Taiyo tracks in Missouri.
Source: Dodge USA
The work generally includes: Removal and replacement of 979 lineal feet of concrete curb and gutter Note 1: The City may choose to remove and replace small portions of existing curb in conjunction with the 2024 Mill & Overlay Program. Additional areas may be added at the discretion of City staff. Exact project locations will be determined after awarding the construction contract, prior to contract
- Status
- Closed
- Sector
- Cement, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Kansas City, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Curb Repair Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally includes: Removal and replacement of 979 lineal feet of concrete curb and gutter Note 1: The City may choose to remove and replace small portions of existing curb in conjunction with the 2024 Mill & Overlay Program. Additional areas may be added at the discretion of City staff. Exact project locations will be determined after awarding the construction contract, prior to contract execution. Note 2: The areas of removal and replacement will be at least a minimum of 10 feet in... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Kansas City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
