2024 Effluent Pipeline Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project consists of the following: 1. Installing approx. 10,600 ft of 20-inch high density polyethylene (HDPE) pipe. 2. Installation of pipe restraints. 3. Construction of (3) above grade valve stations. 4. Tree Clearing. 5. Demolition of approx. 9,100 ft of existing 14-inch fiberglass reinforced pipe (FRP). 6. Demolition of approx. 6,200 ft of existing 14-inch ductile iron pipe (DIP) 7. Demol
- Status
- Prospective
- Sector
- Water Supply and Storage, Metal, Commercial, Chemical (Industrial), Steel, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Manistee, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Effluent Pipeline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the following: 1. Installing approx. 10,600 ft of 20-inch high density polyethylene (HDPE) pipe. 2. Installation of pipe restraints. 3. Construction of (3) above grade valve stations. 4. Tree Clearing. 5. Demolition of approx. 9,100 ft of existing 14-inch fiberglass reinforced pipe (FRP). 6. Demolition of approx. 6,200 ft of existing 14-inch ductile iron pipe (DIP) 7. Demolition of (3) existing above grade valve stations. 8. (4) Bore and Jack installations 9. Abandonme... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Manistee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Commercial, Chemical (Industrial), Steel, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
