2024 Elgin Street Watermain Improvements
Sector: Water Supply and Storage • Location: Cherry Valley, Illinois, United States of America
Source: Dodge USA
Proposals are now being accepted for replacing approximately 1,600 lineal feet of 8 water main with 12 , from the intersection of Lawrence and Elgin Street to the existing 12 water main in front of Village Hall (806. E. State Street). The improvements include Installation of 12 diameter water main, remove and replace Fire Hydrants assemblies, Installation of Valves, replace water services, Removal
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Car parking, Automotive, Government, Commercial
- Location
- Cherry Valley, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Elgin Street Watermain Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposals are now being accepted for replacing approximately 1,600 lineal feet of 8 water main with 12 , from the intersection of Lawrence and Elgin Street to the existing 12 water main in front of Village Hall (806. E. State Street). The improvements include Installation of 12 diameter water main, remove and replace Fire Hydrants assemblies, Installation of Valves, replace water services, Removal and Replacement of Concrete Curb and Gutter, Pavement Patching and Site Restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Cherry Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Car parking, Automotive, Government, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
