2024 Elson Road Utility & Roadway Improvements
Sector: Metal • Location: Waltham, Massachusetts, United States of America
Source: Dodge USA
- Installation of approximately 200 linear feet of new 12 , 8 , and 6 CLDI water main sections and fittings. 2. Cleaning and lining of approximately 1,400 linear feet of existing 6 cast iron water main. 3. Installation of hydrants, gate valves, and all other related appurtenances. 4. Installation of temporary water main servicing residential areas. All temporary connections and reconnections. 5.
- Status
- Closed
- Sector
- Metal, Car parking, Road, Water Supply and Storage, Residential, Power Transmission, Waste Processing and Treatment, Automotive, Government, Steel, Commercial, Power Generation (CCGT)
- Location
- Waltham, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Elson Road Utility & Roadway Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Installation of approximately 200 linear feet of new 12 , 8 , and 6 CLDI water main sections and fittings. 2. Cleaning and lining of approximately 1,400 linear feet of existing 6 cast iron water main. 3. Installation of hydrants, gate valves, and all other related appurtenances. 4. Installation of temporary water main servicing residential areas. All temporary connections and reconnections. 5. Replacement of water services and sewer services. 6. Cleaning, CCTV inspection, approximately 6,3... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Waltham |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Car parking, Road, Water Supply and Storage, Residential, Power Transmission, Waste Processing and Treatment, Automotive, Government, Steel, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
