2024 Flexible Pavement
Bid results · Illinois · Last reported Apr 2024
Source: Dodge USA
Milling and resurfacing/reconstruction of public streets with miscellaneous curb, sidewalk and driveway repairs. Also includes storm sewer repairs, underdrain installation and pavement markings. Some quantities include ton 6,900HMA Surface, 4,100 ton HMA Binder, 10,700FT Curb Replacement. 74,000 SF Sidewalk Replacement.
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Carol Stream, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Flexible Pavement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Milling and resurfacing/reconstruction of public streets with miscellaneous curb, sidewalk and driveway repairs. Also includes storm sewer repairs, underdrain installation and pavement markings. Some quantities include ton 6,900HMA Surface, 4,100 ton HMA Binder, 10,700FT Curb Replacement. 74,000 SF Sidewalk Replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Carol Stream |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
