2024 Gas Collection & Control System Expansion
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
A. The project work to be performed by the Contractor consists of furnishing all labor, materials, equipment, tools, transportation, services, incidentals, and performing all work necessary to complete the project, in place and ready for service in accordance with the Plans and Specifications prepared therefore and entitled 2024 Landfill Gas Collection and Control System Expansion . The work gener
- Status
- Closed
- Sector
- Chemical (Industrial), Government, Oil and Gas, Commercial, Manufacturing (Industrial)
- Location
- Cantonment, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Gas Collection & Control System Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. The project work to be performed by the Contractor consists of furnishing all labor, materials, equipment, tools, transportation, services, incidentals, and performing all work necessary to complete the project, in place and ready for service in accordance with the Plans and Specifications prepared therefore and entitled 2024 Landfill Gas Collection and Control System Expansion . The work generally includes but is not limited to the following items: 1. Construction staking/system layout/su... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Cantonment |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Government, Oil and Gas, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- Camden Street Drain Replacement
- City of Manassas Water Treatment Plant Clearwell No. 2
- Discovery Park Chemical Toilet Replacement
- Contract for the Orinda Water Treatment Plant Disinfection and Chemical Systems Safety Improvements Project in Orinda, California (United States)
- SR 1; SR 53 & SR 341 @ 8 LOCS IN FLOYD & WALKER COUNTY
- BRIDGE PRESERVATION @ 11 SR LOCS IN DISTRICT 3
- I-75 @ 1 LOC;I-85 @ 2 LOC & I-285 @1 LOC-BRIDGE PRESERVATION
