2024 Gosselin Addition
Bidding · Kansas · Last reported Oct 2024
Source: Dodge USA
The project consists of site grading, installation of public utilities; sanitary sewer, water main, and storm sewer, street paving and all other associated work as indicated on the drawings and within the specifications.
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Power Transmission, Road, Government, Power Generation (CCGT)
- Location
- Norton, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Gosselin Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of site grading, installation of public utilities; sanitary sewer, water main, and storm sewer, street paving and all other associated work as indicated on the drawings and within the specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Norton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Power Transmission, Road, Government, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
