2024 HMA Overlay Improvements
Sector: Water Supply and Storage • Location: Spencer, Iowa, United States of America
Source: Dodge USA
Hot Mix Asphalt (HMA) Overlay on the existing street pavement on 10th Avenue E from E 18th Street going North 1,450 feet. The project also includes a mill and HMA overlay on 4th Avenue West from West 1st Street to West 4th Street and on West 5th Street from 2nd Avenue West to 4th Avenue West. The project will also include Portland Cement Concrete (PCC) patching, PCC curb and gutter replacement, PC
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Spencer, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 HMA Overlay Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hot Mix Asphalt (HMA) Overlay on the existing street pavement on 10th Avenue E from E 18th Street going North 1,450 feet. The project also includes a mill and HMA overlay on 4th Avenue West from West 1st Street to West 4th Street and on West 5th Street from 2nd Avenue West to 4th Avenue West. The project will also include Portland Cement Concrete (PCC) patching, PCC curb and gutter replacement, PCC sidewalk ramp upgrades and manhole and valve box adjustments. Site Directions: Portions of 4th ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Spencer |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
