2024 Hwy 80 Waterline Improvements
Sector: Water Supply and Storage • Location: Brandon, Mississippi, United States of America
Source: Dodge USA
Project includes but is not limited to the installation of approximately 2,200 linear feet of waterline consisting of 10 C-900 water main, 10 C-900 HDPE DR-11 directional bored water main, and all other associated work required to complete the project as shown and specified in the plans and contract documents.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
- Location
- Brandon, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Hwy 80 Waterline Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes but is not limited to the installation of approximately 2,200 linear feet of waterline consisting of 10 C-900 water main, 10 C-900 HDPE DR-11 directional bored water main, and all other associated work required to complete the project as shown and specified in the plans and contract documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Brandon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
