logo

2024 Ida Street Pavement and Water System Improvements

Sector: Commercial • Location: Stayton, Oregon, United States of America

Source: Dodge USA

Project
Closed

The project includes, but is not limited to, all labor, materials, and equipment necessary to construct approximately 3,250 square yards of cold plane pavement removal, 900 ton of HMAC over geotextile, 1,100 square feet of 4-inch PCC sidewalk, 750 square feet of 6-inch PCC driveway, 10 ADA compliant sidewalk ramps, 250 lineal feet of standard curb, 575 lineal feet of 10-inch D.I. pipe, 290 lineal

Status
Closed
Sector
Commercial, Metal, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government
Location
Stayton, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Ida Street Pavement and Water System Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Ida Street Pavement and Water System Improvements” is an infrastructure initiative in the Commercial sector, located in Stayton, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes, but is not limited to, all labor, materials, and equipment necessary to construct approximately 3,250 square yards of cold plane pavement removal, 900 ton of HMAC over geotextile, 1,100 square feet of 4-inch PCC sidewalk, 750 square feet of 6-inch PCC driveway, 10 ADA compliant sidewalk ramps, 250 lineal feet of standard curb, 575 lineal feet of 10-inch D.I. pipe, 290 lineal feet of 8-inch D.I. water pipe, 170 lineal feet of 2-inch copper tubing, 155 lineal feet of 1-inc...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Stayton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Metal, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project