2024 Kingsland Point Park Water Service
Sector: Water Supply and Storage • Location: Sleepy Hollow, New York, United States of America
Source: Dodge USA
The work under this contract consists of providing all necessary labor, material and equipment required to replace existing but not limited to: 1. Removal/Abandon existing 6 domestic water main from Palmer Avenue to Kathryn Davis Pavilion as shown on contract drawings. 2. Removal of existing water meter and meter vault. Restoration of area after removal. 3. Install a new 8 water main with water me
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Car parking, Waste Processing and Treatment, Automotive
- Location
- Sleepy Hollow, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Kingsland Point Park Water Service
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work under this contract consists of providing all necessary labor, material and equipment required to replace existing but not limited to: 1. Removal/Abandon existing 6 domestic water main from Palmer Avenue to Kathryn Davis Pavilion as shown on contract drawings. 2. Removal of existing water meter and meter vault. Restoration of area after removal. 3. Install a new 8 water main with water meter and backflow from Edge on the Hudson Housing development property line to the Pavilion. Recon... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Sleepy Hollow |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Car parking, Waste Processing and Treatment, Automotive |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
