2024 Lake County Resurfacing
Closed · Ohio · Last reported Mar 2024
Source: Dodge USA
The work covered by the plans and specifications includes: Pavement planing, partial depth pavement repairs, fabric, asphalt Intermediate course, asphalt surface course, guardrail, storm sewer and related items. All partial depth repair work for Bates Road, Brakeman Road, Lockwood Road, Blair Road and Paine Road
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Waste Processing and Treatment, Government, Commercial
- Location
- Painesville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Lake County Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work covered by the plans and specifications includes: Pavement planing, partial depth pavement repairs, fabric, asphalt Intermediate course, asphalt surface course, guardrail, storm sewer and related items. All partial depth repair work for Bates Road, Brakeman Road, Lockwood Road, Blair Road and Paine Road |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Painesville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
