logo

2024 Leachate Forcemain Construction

Sector: Water Supply and Storage • Location: Pennsylvania, United States of America

Source: Dodge

Project
Bid Results

The project consists of furnishing all labor, equipment and materials necessary for the complete construction of approximately 9,100 lineal feet of double-walled 6-inch by 10-inch HDPE forcemain from the existing LCRMS junction box structure at the entrance to the LCRMS Landfill to the existing West Branch sewer system manhole located on Allenwood Camp Lane, and all related site work identified in

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Road
Location
Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2024 Leachate Forcemain Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Leachate Forcemain Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of furnishing all labor, equipment and materials necessary for the complete construction of approximately 9,100 lineal feet of double-walled 6-inch by 10-inch HDPE forcemain from the existing LCRMS junction box structure at the entrance to the LCRMS Landfill to the existing West Branch sewer system manhole located on Allenwood Camp Lane, and all related site work identified in the Bidding Documents.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Road

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project