2024 Lift Station Improvements
Sector: Water Supply and Storage • Location: Lake Mary, Florida, United States of America
Source: Dodge USA
Furnish all labor, materials, equipment and incidentals required and install, put into operation, and field test one (1) diesel engine driven generator unit, and five (5) lift station control panels and appurtenances as shown on the drawings and specified herein
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Lake Mary, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Lift Station Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish all labor, materials, equipment and incidentals required and install, put into operation, and field test one (1) diesel engine driven generator unit, and five (5) lift station control panels and appurtenances as shown on the drawings and specified herein |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Lake Mary |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
