2024 LRIP Project
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge USA
The hot mix shall be placed at 11-foot lanes and compressed to a depth of 3-inches in 2 lifts. Tack is required between lifts. Bids shall include shouldering at 4-feet on both sides of the road. Bids will need to include tac oil, adjusting manholes and center line striping. Driveways and mailboxes shall be winged out with asphalt. Driveways will need to be adjusted and realigned with existing mate
- Status
- Closed
- Sector
- Commercial, Oil and Gas, Road, Government, Manufacturing (Industrial)
- Location
- Bloomer, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 LRIP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The hot mix shall be placed at 11-foot lanes and compressed to a depth of 3-inches in 2 lifts. Tack is required between lifts. Bids shall include shouldering at 4-feet on both sides of the road. Bids will need to include tac oil, adjusting manholes and center line striping. Driveways and mailboxes shall be winged out with asphalt. Driveways will need to be adjusted and realigned with existing materials |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Bloomer |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Oil and Gas, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
