2024 MCWI/ARPA Improvements - Contract 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The project includes the installation of new aeriation equipment in oxidation ditches, new pumps at headworks, refurbishing existing clarifiers, dispersing existing sludge mound at equalization lagoon, installation of algae control system in equalization lagoon, and replacement of grit removal equipment.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Government, Manufacturing (Industrial)
- Location
- Brookhaven, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 MCWI/ARPA Improvements - Contract 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the installation of new aeriation equipment in oxidation ditches, new pumps at headworks, refurbishing existing clarifiers, dispersing existing sludge mound at equalization lagoon, installation of algae control system in equalization lagoon, and replacement of grit removal equipment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Brookhaven |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Government, Manufacturing (Industrial) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
