2024 MFT Pavement Patching
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project includes the removal and replacement of defective concrete pavement, necessary drainage improvements, and other related work. The description of the work for concrete patching will include pavement removal, placement of the Portland cement concrete pavement, and capping each patch with two inches (2 ) of HMA surface course. The patch sizes in will range from 40 square yards to 200+ sq
- Status
- Closed
- Sector
- Road, Cement, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- River Grove, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 MFT Pavement Patching
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the removal and replacement of defective concrete pavement, necessary drainage improvements, and other related work. The description of the work for concrete patching will include pavement removal, placement of the Portland cement concrete pavement, and capping each patch with two inches (2 ) of HMA surface course. The patch sizes in will range from 40 square yards to 200+ square yards. The size and quantity of patches is subject to change, as determined by field conditions |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | River Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
