logo

2024 Mississippian Railway Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Project
Closed

The proposed project includes replacement of 1000 track foot of 90-pound rail with 32- pound rail, 1,500 linear foot of track resurfacing, 1,157 crossties to be replaced, switch tie replacement for #10 switch, and 400 tons of ballast.

Status
Closed
Sector
Mass Transit, Rail, Government, Commercial
Location
Fulton, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Mississippian Railway Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Mississippian Railway Improvements” is an infrastructure initiative in the Mass Transit sector, located in Fulton, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project includes replacement of 1000 track foot of 90-pound rail with 32- pound rail, 1,500 linear foot of track resurfacing, 1,157 crossties to be replaced, switch tie replacement for #10 switch, and 400 tons of ballast.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Fulton

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project