2024 Montrose Route 152
Sector: Manufacturing (Industrial) • Location: Charlottetown, Prince Edward Island, Canada
Source: Dodge
The work includes: Cold planing existing asphalt full depth (assumed 200 mm), earth excavation, placing select borrow (600 mm), placing granular A (250 mm), placing asphalt base A (65 mm), placing asphalt seal B (45 mm), landscaping and all other work necessary to complete the Contract.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Charlottetown, Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024 Montrose Route 152
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes: Cold planing existing asphalt full depth (assumed 200 mm), earth excavation, placing select borrow (600 mm), placing granular A (250 mm), placing asphalt base A (65 mm), placing asphalt seal B (45 mm), landscaping and all other work necessary to complete the Contract. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
City | Charlottetown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
