logo

2024 Morada Area Streets Resurfacing

Sector: Cement • Location: Morada, California, United States of America

Source: Dodge USA

Project
Closed

The work, in general, consists of repairing and resurfacing approximately 1.0 mile of roadway with asphalt concrete. The work is located in northeast Stockton. (Broughton Drive: Springfield Way to Madeline Drive; Camden Court: West End to Springfield Way; Hickory Avenue: Morada Lane to N/E End; West End to Plum Avenue; Madeline Drive: Morada Lane to Broughton Drive; Morada Lane: East Alhambra Aven

Status
Closed
Sector
Cement, Road, Government, Commercial, Manufacturing (Industrial)
Location
Morada, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Morada Area Streets Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Morada Area Streets Resurfacing” is an infrastructure initiative in the Cement sector, located in Morada, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work, in general, consists of repairing and resurfacing approximately 1.0 mile of roadway with asphalt concrete. The work is located in northeast Stockton. (Broughton Drive: Springfield Way to Madeline Drive; Camden Court: West End to Springfield Way; Hickory Avenue: Morada Lane to N/E End; West End to Plum Avenue; Madeline Drive: Morada Lane to Broughton Drive; Morada Lane: East Alhambra Avenue to Michelle Lane; Springfield Way: Broughton Drive to Ashley Lane)

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Morada

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project