logo
ProjectBidding

2024 Multi-Use Trail Program

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

2024 Multi-Use Trail Program - This work is to include: Bellerose Drive from (Evergre Drive to Erin Ridge Drive) +/-1240m - 50mm asphalt 04( +/-380m of remove and replace o a halt sections with tree root barrier 2 Ty Boulevard Ramp lo Bellerose Drive and Edward Way

Status
Prospective
Sector
Road, Mass Transit, Government, Rail, Commercial
Location
St. Albert, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Multi-Use Trail Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Multi-Use Trail Program” is an infrastructure initiative in the Road sector, located in St. Albert, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2024 Multi-Use Trail Program - This work is to include: Bellerose Drive from (Evergre Drive to Erin Ridge Drive) +/-1240m - 50mm asphalt 04( +/-380m of remove and replace o a halt sections with tree root barrier 2 Ty Boulevard Ramp lo Bellerose Drive and Edward Way

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

St. Albert

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Mass Transit, Government, Rail, Commercial

Article published date

2024-07-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project