2024 Municipal Road Program
Sector: Water Supply and Storage • Location: Norwood, New Jersey, United States of America
Source: Dodge USA
The scope of work within the base bid generally consists of milling, resurfacing, spot full-depth pavement repair, spot curb repair, spot sidewalk repair, ADA ramp reconstruction, and reconstructing/resetting of all storm, sanitary, and utility structures along Tilden Place, Frasco Lane, Adams Street, and Burlington Street within the Borough of Norwood. Additionally, the scope of work within the b
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Car parking, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial)
- Location
- Norwood, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Municipal Road Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work within the base bid generally consists of milling, resurfacing, spot full-depth pavement repair, spot curb repair, spot sidewalk repair, ADA ramp reconstruction, and reconstructing/resetting of all storm, sanitary, and utility structures along Tilden Place, Frasco Lane, Adams Street, and Burlington Street within the Borough of Norwood. Additionally, the scope of work within the base bid consists of installing sidewalk, ADA curb ramps, and flashing LED signage along Broadway ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Norwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Car parking, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
