2024 Natural Gas System Expansion Phase 2
Sector: Chemical (Industrial) • Location: Tullahoma, Tennessee, United States of America
Source: Dodge USA
Include the installation of approximately 59,000 feet of 6 , 4 and 2 polyethylene pipe, polyethylene valves 6 and smaller, tie-ins, approximately 50 services, pigging, testing and purging, horizontal directional drilled bores, erosion control and other appurtenances as set out in plans and specifications. The eleven (11) project locations consist of rural expansions and rehabilitation type project
- Status
- Closed
- Sector
- Chemical (Industrial), Commercial, Oil and Gas, Natural Gas, Government, Manufacturing (Industrial)
- Location
- Tullahoma, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Natural Gas System Expansion Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Include the installation of approximately 59,000 feet of 6 , 4 and 2 polyethylene pipe, polyethylene valves 6 and smaller, tie-ins, approximately 50 services, pigging, testing and purging, horizontal directional drilled bores, erosion control and other appurtenances as set out in plans and specifications. The eleven (11) project locations consist of rural expansions and rehabilitation type projects in Franklin and Coffee Counties. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Tullahoma |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Commercial, Oil and Gas, Natural Gas, Government, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
