2024 NE Region Site Prep & Release
Sector: Commercial • Location: Aitkin, Minnesota, United States of America
Source: Dodge USA
The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary for mechanical and chemical site preparation and chemical crop tree release as specified below. The sites to be treated are located within the following Department of Natural Resources (DNR) Forestry Areas: Aitkin, Deer River, Hibbing, Littlefork, Tower, and T
- Status
- Closed
- Sector
- Commercial, Chemical (Industrial), Fertilizers, Raw Materials, Seaport, Manufacturing (Industrial)
- Location
- Aitkin, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 NE Region Site Prep & Release
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary for mechanical and chemical site preparation and chemical crop tree release as specified below. The sites to be treated are located within the following Department of Natural Resources (DNR) Forestry Areas: Aitkin, Deer River, Hibbing, Littlefork, Tower, and Two Harbors. The proposed total area requiring treatment is broken down into five (5) Bid Groups, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Aitkin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Chemical (Industrial), Fertilizers, Raw Materials, Seaport, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
