logo

2024 Northeast Sanitary Sewer Rehabilitation Phase 1

One of 10,000+ projects Taiyo tracks in New York.

Source: Dodge USA

Project
Closed

This contract generally consists of Pre-CCTV and Post-CCTV inspection of approximately 8,853 linear feet of 8 sanitary sewer main, testing, and grout injection of approximately 681 sewer main pipe joints and 132 lateral connections, spot repair of structural defects using a trenchless CIPP method, and other work as specified and indicated on the Contract Documents. Contract to be completed in 2024

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Ithaca, New York, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2024 Northeast Sanitary Sewer Rehabilitation Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2024 Northeast Sanitary Sewer Rehabilitation Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Ithaca, New York, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This contract generally consists of Pre-CCTV and Post-CCTV inspection of approximately 8,853 linear feet of 8 sanitary sewer main, testing, and grout injection of approximately 681 sewer main pipe joints and 132 lateral connections, spot repair of structural defects using a trenchless CIPP method, and other work as specified and indicated on the Contract Documents. Contract to be completed in 2024.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Ithaca

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project