2024 Outfall Repair Program
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge USA
The City of Red Deer has roughly 300 stormwater outfalls to the river and creeks within the City limits. In 2013, major flooding occurred on the Red Deer River. In 2014, 145 of the outfalls were inspected to determine their current condition. Of these, Outfalls 103, 132, 195 and 197 were negatively impacted by the 2013 flood based on orthophoto analysis and were chosen for repairs.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Red Deer, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Outfall Repair Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Red Deer has roughly 300 stormwater outfalls to the river and creeks within the City limits. In 2013, major flooding occurred on the Red Deer River. In 2014, 145 of the outfalls were inspected to determine their current condition. Of these, Outfalls 103, 132, 195 and 197 were negatively impacted by the 2013 flood based on orthophoto analysis and were chosen for repairs. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Red Deer |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
