2024 Parking Lot Pavement Maintenance
Closed · Iowa · Last reported Jun 2024
Source: Dodge USA
The Work generally consists of parking lot and roadway pavement maintenance including, PCC and HMA patching, cleaning and filling PCC pavement joints and PCC and HMA cracks, emulsified asphalt slurry seal, waterborne and thermoplastic pavement markings and traffic control at the Eastern Iowa Airport in Cedar Rapids, Iowa. Rental Car Ready Lot: Early Start Date: July 22, 2024 Late Start Date: May 1
- Status
- Closed
- Sector
- Automotive, Airport, Car parking, Road, Government, Commercial
- Location
- Cedar Rapids, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Parking Lot Pavement Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work generally consists of parking lot and roadway pavement maintenance including, PCC and HMA patching, cleaning and filling PCC pavement joints and PCC and HMA cracks, emulsified asphalt slurry seal, waterborne and thermoplastic pavement markings and traffic control at the Eastern Iowa Airport in Cedar Rapids, Iowa. Rental Car Ready Lot: Early Start Date: July 22, 2024 Late Start Date: May 12, 2025 Complete within 45 Calendar Days Rental Car Facility Lot: Late Start Date: May 27, 2025 C... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Cedar Rapids |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Airport, Car parking, Road, Government, Commercial |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
