2024 Pavement Management Phase I Microsurface - Fog Seal
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
The work under this contract will include all equipment, labor, materials, supplies, etc. necessary to furnish and complete the work described in this contract. Such work shall include installation of micro-surfacing, fog sealing, and crack sealing. It will also include adjusting castings and driveway aprons within the project limits. The proposed work shall also include removal and placement of p
- Status
- Closed
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Concord, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Pavement Management Phase I Microsurface - Fog Seal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work under this contract will include all equipment, labor, materials, supplies, etc. necessary to furnish and complete the work described in this contract. Such work shall include installation of micro-surfacing, fog sealing, and crack sealing. It will also include adjusting castings and driveway aprons within the project limits. The proposed work shall also include removal and placement of pavement markings including crosswalks and/or stop lines. The proposed work also includes supplyin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Concord |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
