2024 Pavement Overlay Project
Sector: Cement • Location: Redwood City, California, United States of America
Source: Dodge USA
The work of this project consists generally of: without limitation, asphalt concrete grinding, area repairs, and overlay; asphalt concrete speed cushions; utility cover adjustments; traffic signage and striping; temporary traffic control; stormwater pollution protection. Work shall be completed within 90 Calendar Days from the date when Contract Time commences to run.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work of this project consists generally of: without limitation, asphalt concrete grinding, area repairs, and overlay; asphalt concrete speed cushions; utility cover adjustments; traffic signage and striping; temporary traffic control; stormwater pollution protection. Work shall be completed within 90 Calendar Days from the date when Contract Time commences to run. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
