2024 Pavement Patching
Closed · Minnesota · Last reported Apr 2024
Source: Dodge USA
The work generally consists of hand patching potholes in excess of two (2) inches deep before applying a three-quarter (3/4) inch overlay at twenty-six (26) feet wide on approximately four (4) miles of City streets. The work is estimated to include: -- 2,800 Tons Type SP 9.5 Bituminous Mixture for Patching -- 1,300 Gallons Bituminous Material for Tack Coat (CSS-1h) -- 120 Hours 4-Person Crew -- Mo
- Status
- Closed
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Oak Grove, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Pavement Patching
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally consists of hand patching potholes in excess of two (2) inches deep before applying a three-quarter (3/4) inch overlay at twenty-six (26) feet wide on approximately four (4) miles of City streets. The work is estimated to include: -- 2,800 Tons Type SP 9.5 Bituminous Mixture for Patching -- 1,300 Gallons Bituminous Material for Tack Coat (CSS-1h) -- 120 Hours 4-Person Crew -- Mobilization (Lump Sum) -- Traffic Control (Lump Sum) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Oak Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
